CONSULTING
The IRCA Global Consulting Division provides a range of consulting services and supporting products aimed at adding real value to our Customers and Partners. Our range of services and products can be grouped logically, based on the respective consulting phases listed below. Solutions are designed specific to customer requirements, depending on strategic thrusts, defined priorities, or potential high-risk issues identified.
• Audit Protocols (CAP, Legal Compliance, Business Continuity, Food Safety, Motor Manufacturing)
• Systems and Implementation
Consulting Phases
Analysis Phase
The analysis phase is optional, especially when the status quo is clear. It is however useful to obtain a quantified baseline against which future improvement can be measured. Typical analysis methods are:
• Baseline Risk Assessment
• Interviews
• Audit
• Perception Surveys
Design Phase
The design phase consists of the definition of the organisation's business processes into an operations manual. This operations manual is developed on our unique Electronic Business Management System (EBMS), built with standard Microsoft® applications (Visio® and Expression Web®). The EBMS is made available online via the Intranet (or Wide Area Network for multiple site operations), allowing all employees access to these business processes. The fact that the EBMS is developed in the HTML environment allows for seamless integration from the business processes to relevant IT applications, e.g. databases, ERP systems and document management systems.
The design phase can be described in four broad steps, namely:
Step 1: Define the enterprise model
Step 2: Define detailed, lower level processes
Step 3: Integrate relevant requirements
Step 4: Test acceptance
Implementation Phase
During this phase we provide guidance and assistance (and supporting software products, if required) with the implementation of new business processes, normally processes outside the normal scope of business and specific to the standards / guidelines / legal requirements. This includes:
• EBMS maintenance and awareness training
• Corrective and preventive actions
• Performance monitoring and measurement
• Perception surveys
• Inspection
• System implementation audits and assistance with improvement.
Assessment Phase
Various methods of assessment are available to organisations, with the following assistance and / or supporting products:
• Internal and second party audits (SHEQ/Legal Compliance/Business Continuity, etc.)
• Analysis of data.
Review Phase
We provide assistance in defining the approach to conducting Management Reviews. Data analyses from the assessment phase forms the basis of Management Reviews. Additional input requirements are defined and the review outputs are structured as actions in the Improvement Phase.
Improvement Phase
Improvement and change activities are structured and managed to ensure controlled change, with the management of activities to closure. Improvement results are quantified and, where applicable, reflected against baselines determined during the analysis phase. Various other IRCA Global services and products can integrate with the Consulting Division services and products within various phases to provide a total solution.
Benefits of the EBMS
• Procedures can be used as the basis for employee training and development.
• Only current procedures / policies / standards / forms / etc. are available to all employees registered on the IT network.
• The EBMS is linked to other IT systems in the organisation – providing direct access to relevant documentation and systems or even transactions..
• Changed / updated procedures become available immediately through the EBMS.
• The system is easily maintained in-house – full training is provided to ensure organisational ownership after completion of the system design.
• Clearly defined processes form the basis for continual improvement, incremental and breakthrough.
Company News
- 13 April 2011
IRCA signs JV with IMS.
IRCA Global is proud to announce a JV agreement with Immortal Safety Products (Pty) Ltd, signed on 13 April 2011.
- 27 June 2011
SHEQ Book Launch.
This book presents a new dimension to traditional safety, health, environment and quality management and serves as a fundamental guide for anyone with SHEQ responsibilities or interest irrespective of their role in an organization. ...